Simply requiring fast, easy connection to water and power once sited, they significantly reduce time and labour costs, becoming operational almost immediately.
Insulated enclosures minimise operating noise levels, whilst pre-assembly and testing in the factory eliminates potential coordination problems later on site. Each complete pump house can be engineered and tailored to meet the required specifications.